Bus shelter manufacturers: The construction process of the bus station burial
Release date : 26 Aug 2022

The bus shelter brings great convenience to the passengers waiting for the bus. For the bus shelter platform, the installation is more important. The installation is inseparable from the burying of the parts. For the common methods of burying and various methods, What is it like? We should pay attention to various buried paths and construction procedures so that the effect of the bus shelter after installation and use is better, and the installation is more solid and firm.

The first is to confirm the size of the foundation pit for the installation of the shelter. Before production, the manufacturer will generally design the construction drawings and will prepare the embedded drawings in advance and send them to the customer or the construction party. When the foundation is excavated, it is only necessary to operate according to the actual foundation map. Generally speaking, the size of the foundation pit is 80*60*60 cm. Of course, different foundation pit sizes should be designed according to the size of the bus shelter. The size of the foundation pit should be dug in strict accordance with the dimensions marked on the drawings, and attention should also be paid to the flatness of the facade and the lateral surface, and the angle of inclination should not be too large. In addition, in the construction of some old urban areas, attention should be paid to avoiding problems such as water pipes and cables and reserve the position of power line pipes according to the drawings. It is best to lay the line pipes simultaneously. neater. The first step in the excavation of the foundation pit is to find the position of the first column, and it is necessary to make a mark, and then use this as the base point to find the point of the next column. Here, a level is used to measure the flatness, and then mark it with a line, and then the construction can be carried out.

bus shelter

The second is to place the embedded parts for the installation of the shelter platform. This step is very important and crucial. Generally, the bottom is leveled with concrete, and then the embedded parts are placed. At this time, they need to be placed according to the position of the marking line, to ensure that the front, rear, left and right are flush, and the level is at the same height. And this step requires the construction personnel to do it patiently and responsibly because if it is not placed properly, it will directly affect the later installation. After the embedded parts are placed in place, the concrete can be poured. After mixing the concrete evenly, pour it into every point, and there must be no omission. Since it takes time for the concrete to solidify, the concrete will gradually tighten as the water evaporates during the solidification process, and sometimes the embedded parts will be taken away from the original position, resulting in deviations of the embedded parts, so be sure to remember to often Check and correct in time when problems are found, to ensure that there is no deviation in the size and level of embedded parts.

The construction process of bus shelter burial should pay attention to the above points.